United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTPioneer DJ Wind
Pioneer DJ Wind is a 140 MW onshore wind request built and operating in the ERCOT interconnection queue, in Midland County, Texas.
Request details
- Queue ID
- 23INR0387
- Grid region
- ERCOT (Texas)
- Developer
- Pioneer Hutt Wind Energy LLC
- Connection point (POI)
- 138 kV Driver station (Bus #: 23863)
- Location
- Midland County, Texas
- Technology
- Wind: 140 MW
- Total requested
- 140 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 10 October 2021
- Agreement signed
- 4 April 2023
- Proposed online date
- February 2025
- Came online
- February 2025
Location
Marker shows the centre of Midland County; the queue data does not give exact sites.
Other requests in Midland County
- Greater Bryant G SolarSolar · 17.7 MW · agreement signed
- TRIFECTA GasGas · 453 MW · in study
- Energy City BESSBattery storage · 205 MW · in study
- Drill Baby Drill BESSBattery storage · 204 MW · in study
- Jasper BESSBattery storage · 201 MW · in study
- Pioneer Hutt Solar (Alternative POI)Solar · 116 MW · in study
- Pioneer Hutt SolarSolar · 116 MW · suspended
- Gas project GEN-2009-007, Midland CountyGas · 550 MW · withdrawn
- Hutt WindOnshore wind · 336 MW · withdrawn
- Pioneer Hutt Solar (Add Additional MWs)Solar · 65.8 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem