United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Nezuko BESS

Nezuko BESS is a 63.1 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0220
Grid region
ERCOT (Texas)
Developer
AEU BATTERY PROJECT I LLC
Connection point (POI)
Tap 69 kV 6202 ALBNY_FD2A - 60426 HULLTOWN2A
Technology
Battery: 63.1 MW
Total requested
63.1 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
31 July 2023
Proposed online date
January 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem