United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Temple Generation I Repower

Temple Generation I Repower is a 67.0 MW gas request withdrawn in the ERCOT interconnection queue, in Bell County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0533
Grid region
ERCOT (Texas)
Location
Bell County, Texas
Technology
Gas: 67.0 MW
Total requested
67.0 MW
Queue status
Withdrawn
Entered queue
25 April 2021
Withdrawn
November 2025

Location

Marker shows the centre of Bell County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem