United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTAugustus Solar
Augustus Solar is a 76.7 MW solar request withdrawn in the ERCOT interconnection queue, in Martin County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2023 (completed)
- Withdrawn / abandonedMay 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26INR0037
- Grid region
- ERCOT (Texas)
- Developer
- Industrial Golf Project LLC
- Connection point (POI)
- 11374 REDLAKEGP_P8 138kV
- Location
- Martin County, Texas
- Technology
- Solar: 76.7 MW
- Total requested
- 76.7 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 16 January 2023
- Proposed online date
- May 2026
- Withdrawn
- May 2023
Location
Marker shows the centre of Martin County; the queue data does not give exact sites.