πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Augustus Solar

Augustus Solar is a 76.7 MW solar request withdrawn in the ERCOT interconnection queue, in Martin County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2023 (completed)
  2. Withdrawn / abandonedMay 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0037
Grid region
ERCOT (Texas)
Developer
Industrial Golf Project LLC
Connection point (POI)
11374 REDLAKEGP_P8 138kV
Location
Martin County, Texas
Technology
Solar: 76.7 MW
Total requested
76.7 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 January 2023
Proposed online date
May 2026
Withdrawn
May 2023

Location

Marker shows the centre of Martin County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Martin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem