BATTERY STORAGE · ERCOT

High Chap Storage

High Chap Storage is a 71.8 MW battery storage request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2022 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0072
Grid region
ERCOT (Texas)
Developer
HIGH CHAPARRAL SOLAR PROJECT LLC
Connection point (POI)
43035 Oasis 345kV - 42500 Dow Chemical 345 kV Ckt 18
Location
Brazoria County, Texas
Technology
Battery: 71.8 MW
Total requested
71.8 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
24 July 2022
Proposed online date
June 2028
Withdrawn
December 2025

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem