United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTBlue Sky Solar
Blue Sky Solar is a 65.0 MW solar request withdrawn in the ERCOT interconnection queue, in Crockett County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2020 (completed)
- Withdrawn / abandonedOct 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0025
- Grid region
- ERCOT (Texas)
- Developer
- Blue Sky Solar
- Connection point (POI)
- 6562 Friend Ranch 138kV
- Location
- Crockett County, Texas
- Technology
- Solar: 65.0 MW
- Total requested
- 65.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 25 February 2020
- Proposed online date
- December 2022
- Withdrawn
- October 2020
Location
Marker shows the centre of Crockett County; the queue data does not give exact sites.
Other requests in Crockett County
- Midnight Sun Energy StorageBattery storage Β· 510 MW Β· agreement signed
- Big Sampson WindOnshore wind Β· 265 MW Β· agreement signed
- Blue Sky SolSolar + storage Β· 101 MW Β· agreement signed
- Gridline SolarSolar Β· 400 MW Β· in study
- Ranchero BESSBattery storage Β· 150 MW Β· in study
- Black Bear SolarSolar + storage Β· 103 MW Β· in study
- Black Bear BESSSolar + storage Β· 51.2 MW Β· in study
- Shamrock II WindOnshore wind Β· 257 MW Β· suspended
- High Lonesome WindOnshore wind Β· 450 MW Β· built
- White Mesa 2 WindOnshore wind Β· 348 MW Β· built
- Ranchero WindOnshore wind Β· 300 MW Β· built
- ShamrockOnshore wind Β· 224 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem