Barrett Storage

Barrett Storage is a 76.5 MW other request withdrawn in the ERCOT interconnection queue, in Rains County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2022 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0478
Grid region
ERCOT (Texas)
Developer
BT Barrett Solar, LLC
Connection point (POI)
Tap 138 kV 6869 SNYPT_RC - 6871 LNOK_RC_x000D_ _x000D_ Rayburn owned
Location
Rains County, Texas
Technology
Other: 76.5 MW
Total requested
76.5 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 December 2022
Proposed online date
December 2024
Withdrawn
March 2024

Location

Marker shows the centre of Rains County; the queue data does not give exact sites.