SOLAR Β· ERCOT

Merrifield Solar

Merrifield Solar is a 80.0 MW solar request withdrawn in the ERCOT interconnection queue, in Hill County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2018 (completed)
  2. Withdrawn / abandonedMay 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0118
Grid region
ERCOT (Texas)
Developer
Belltown Power
Connection point (POI)
tap 69kV 3523 Hillsboro - 3543 Mertens or tap 345kV 1906 Venus - 68090 Sam
Location
Hill County, Texas
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 June 2018
Proposed online date
December 2020
Withdrawn
May 2019

Location

Marker shows the centre of Hill County; the queue data does not give exact sites.