United States › Grid › Interconnection queues › Texas

SOLAR · ERCOT

OCI SunRoper MW Increase to 24INR0167

OCI SunRoper MW Increase to 24INR0167 is a 61.6 MW solar request withdrawn in the ERCOT interconnection queue, in Wharton County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0291
Grid region
ERCOT (Texas)
Developer
OCI SunRoper LLC
Connection point (POI)
tap138kV #43190 South Lane City to #42985 Dyann CKT#60
Location
Wharton County, Texas
Technology
Solar: 61.6 MW
Total requested
61.6 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
June 2025
Withdrawn
October 2023

Location

Marker shows the centre of Wharton County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Wharton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem