BATTERY STORAGE Β· ERCOTClaxton Storage
Claxton Storage is a 75.7 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- ConsentedJul 2025 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0205
- Grid region
- ERCOT (Texas)
- Developer
- BT Claxton Solar, LLC
- Connection point (POI)
- Tap 345kV line between Allen Switch (#2514) and Monticello (#1696)
- Technology
- Battery: 75.7 MW
- Total requested
- 75.7 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 21 September 2022
- Agreement signed
- 2 July 2025
- Proposed online date
- September 2027
- Withdrawn
- October 2025
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem