BATTERY STORAGE Β· ERCOT

Claxton Storage

Claxton Storage is a 75.7 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. ConsentedJul 2025 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0205
Grid region
ERCOT (Texas)
Developer
BT Claxton Solar, LLC
Connection point (POI)
Tap 345kV line between Allen Switch (#2514) and Monticello (#1696)
Technology
Battery: 75.7 MW
Total requested
75.7 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
21 September 2022
Agreement signed
2 July 2025
Proposed online date
September 2027
Withdrawn
October 2025

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem