United States βΊ Grid βΊ Interconnection queues βΊ Texas
BATTERY STORAGE Β· ERCOTLanger Storage
Langer Storage is a 61.5 MW battery storage request withdrawn in the ERCOT interconnection queue, in Bosque County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2021 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- ConsentedMay 2025 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 23INR0266
- Grid region
- ERCOT (Texas)
- Developer
- Langer Solar, LLC
- Connection point (POI)
- tap 345kV 68040 Kopperl - 68091 Navarro
- Location
- Bosque County, Texas
- Technology
- Battery: 61.5 MW
- Total requested
- 61.5 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 9 May 2021
- Agreement signed
- 8 May 2025
- Proposed online date
- March 2027
- Withdrawn
- December 2025
Location
Marker shows the centre of Bosque County; the queue data does not give exact sites.
Other requests in Bosque County
- Hickerson SolarSolar + storage Β· 311 MW Β· agreement signed
- Woodland Energy StorageBattery storage Β· 208 MW Β· in study
- BRP Pollux BESSBattery storage Β· 163 MW Β· in study
- Solheim SolarSolar Β· 109 MW Β· in study
- Symank SolarSolar Β· 66.6 MW Β· in study
- Meridian BESSBattery storage Β· 31.2 MW Β· in study
- Sultan SolarSolar Β· 206 MW Β· suspended
- Sultan BESSBattery storage Β· 204 MW Β· suspended
- Owens SolarSolar Β· 204 MW Β· suspended
- Rueter SolarSolar Β· 200 MW Β· suspended
- Angus SolarSolar Β· 113 MW Β· suspended
- Angus StorageBattery storage Β· 63.0 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem