SOLAR Β· ERCOTAngus Solar
Angus Solar is a 113 MW solar request suspended in the ERCOT interconnection queue, in Bosque County, Texas.
Queue statusPaused / redesign
- PlanningQueued Nov 2017 (current stage)
- ConsentedDec 2021 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 20INR0035
- Grid region
- ERCOT (Texas)
- Developer
- Angus Solar, LLC
- Connection point (POI)
- tap 138kV 177 Bosque - 181 Cayote
- Location
- Bosque County, Texas
- Technology
- Solar: 113 MW
- Total requested
- 113 MW
- Study phase
- IA
- Queue status
- Suspended
- Entered queue
- 12 November 2017
- Agreement signed
- 6 December 2021
- Proposed online date
- November 2026
- Withdrawn
- March 2021
Location
Marker shows the centre of Bosque County; the queue data does not give exact sites.
Other requests in Bosque County
- Hickerson SolarSolar + storage Β· 311 MW Β· agreement signed
- Woodland Energy StorageBattery storage Β· 208 MW Β· in study
- BRP Pollux BESSBattery storage Β· 163 MW Β· in study
- Solheim SolarSolar Β· 109 MW Β· in study
- Symank SolarSolar Β· 66.6 MW Β· in study
- Meridian BESSBattery storage Β· 31.2 MW Β· in study
- Sultan SolarSolar Β· 206 MW Β· suspended
- Sultan BESSBattery storage Β· 204 MW Β· suspended
- Owens SolarSolar Β· 204 MW Β· suspended
- Rueter SolarSolar Β· 200 MW Β· suspended
- Angus StorageBattery storage Β· 63.0 MW Β· suspended
- Dileo SolarSolar Β· 71.4 MW Β· built