United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Owens Solar

Owens Solar is a 204 MW solar request suspended in the ERCOT interconnection queue, in Bosque County, Texas.

Queue statusPaused / redesign
  1. PlanningQueued Feb 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
24INR0213
Grid region
ERCOT (Texas)
Developer
Owens Solar LLC
Connection point (POI)
Tap 138kV line between 177 BOSQUE and 181 Cayote
Location
Bosque County, Texas
Technology
Solar: 204 MW
Total requested
204 MW
Study phase
FIS
Queue status
Suspended
Entered queue
6 February 2022
Proposed online date
December 2025
Withdrawn
October 2025

Location

Marker shows the centre of Bosque County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bosque County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem