PV New Glory

PV New Glory is a 72.5 MW solar request withdrawn in the ERCOT interconnection queue, in Stonewall County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2021 (completed)
  2. Withdrawn / abandonedMar 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0377
Grid region
ERCOT (Texas)
Developer
PREMIER ENGINEERING USA CORP.
Connection point (POI)
6120 Rule 69kV
Location
Stonewall County, Texas
Technology
Solar: 72.5 MW
Total requested
72.5 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
11 October 2021
Proposed online date
September 2024
Withdrawn
March 2023

Location

Marker shows the centre of Stonewall County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Stonewall County