United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTSun Cactus Storage
Sun Cactus Storage is a 63.2 MW other request withdrawn in the ERCOT interconnection queue, in Duval County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0110
- Grid region
- ERCOT (Texas)
- Developer
- Sun Cactus Solar Project, LLC
- Connection point (POI)
- tap 138kV 8510 Falfurrias - 8695 Crestonio
- Location
- Duval County, Texas
- Technology
- Other: 63.2 MW
- Total requested
- 63.2 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 17 July 2022
- Proposed online date
- March 2026
- Withdrawn
- October 2023
Location
Marker shows the centre of Duval County; the queue data does not give exact sites.
Other requests in Duval County
- Dove Run SolarSolar Β· 121 MW Β· agreement signed
- Sun Cactus SolarSolar Β· 121 MW Β· agreement signed
- Cielo Vista SolarSolar + storage Β· 503 MW Β· in study
- Cielo Vista Power Gas PlantGas Β· 335 MW Β· in study
- Cielo Vista StorageSolar + storage Β· 311 MW Β· in study
- Estrella Dorada WindOnshore wind Β· 306 MW Β· in study
- Cazadores SolarSolar Β· 302 MW Β· in study
- Apricot Sun StorageSolar + storage Β· 301 MW Β· in study
- Black Hawk SolarSolar Β· 251 MW Β· in study
- Apricot Sun SolarSolar + storage Β· 246 MW Β· in study
- Allthorn SolarSolar + storage Β· 232 MW Β· in study
- Allthorn BESSSolar + storage Β· 205 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem