🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

SOLAR · ERCOT

Black Hawk Solar

Black Hawk Solar is a 251 MW solar request in interconnection study in the ERCOT interconnection queue, in Duval County, Texas.

Queue statusIn planning
  1. PlanningQueued Feb 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
28INR0040
Grid region
ERCOT (Texas)
Developer
ACE DevCo NC, LLC
Connection point (POI)
San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.
Location
Duval County, Texas
Technology
Solar: 251 MW
Total requested
251 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
27 February 2024
Proposed online date
December 2028

Location

Marker shows the centre of Duval County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Duval County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem