Nereida Solar

Nereida Solar is a 77.6 MW solar request withdrawn in the ERCOT interconnection queue, in Jones County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0312
Grid region
ERCOT (Texas)
Developer
ABEI & INFRASTRUCTURE S.L.
Connection point (POI)
Tap 138kV 1398 Radium - 1318 China Grove Switch
Location
Jones County, Texas
Technology
Solar: 77.6 MW
Total requested
77.6 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 May 2019
Proposed online date
June 2022
Withdrawn
September 2020

Location

Marker shows the centre of Jones County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Jones County