Enbridge Ingleside Storage Cancel

Enbridge Ingleside Storage Cancel is a 61.9 MW other request withdrawn in the ERCOT interconnection queue, in San Patricio County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedJul 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0389
Grid region
ERCOT (Texas)
Developer
Enbridge Ingleside Solar, LLC
Connection point (POI)
8808 HOMEPORT 138kV
Location
San Patricio County, Texas
Technology
Other: 61.9 MW
Total requested
61.9 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
May 2025
Withdrawn
July 2022

Location

Marker shows the centre of San Patricio County; the queue data does not give exact sites.