ONSHORE WIND Β· ERCOT

Mason Mt Wind

Mason Mt Wind is a 62.0 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
15INR0081
Grid region
ERCOT (Texas)
Developer
Enel Green
Connection point (POI)
tap 138kV 6364 Yellowjacket - 76390 Ft Mason
Technology
Wind: 62.0 MW
Total requested
62.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
9 April 2014
Proposed online date
December 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in