United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in Texas (2017 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar project GEN-2017-219, Lamb County Solar |
600 MW | Withdrawn / abandoned |
| Solar project GEN-2017-218, Lamb County Solar |
600 MW | Withdrawn / abandoned |
| Solar project GEN-2017-080, Lamb County Solar |
525 MW | Withdrawn / abandoned |
| Green Valley Wind Onshore wind · Eon |
500 MW | Withdrawn / abandoned |
| Deepwater Gas · AES |
462 MW | Withdrawn / abandoned |
| Normande Solar Farm Solar · 8minutenergy |
360 MW | Withdrawn / abandoned |
| Hutt Wind Onshore wind · Pioneer Natural Resources |
336 MW | Withdrawn / abandoned |
| Pease River Wind Onshore wind · Eon |
301 MW | Withdrawn / abandoned |
| Solar project GEN-2017-190, Bailey County Solar |
300 MW | Withdrawn / abandoned |
| Solar project GEN-2017-217, Lamb County Solar |
300 MW | Withdrawn / abandoned |
| Solar project GEN-2017-081, Randall County Solar |
300 MW | Withdrawn / abandoned |
| Other project GEN-2017-176, Castro County Other |
300 MW | Withdrawn / abandoned |
| Bird Dog Wind Onshore wind · Americlean |
300 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-029, Deaf Smith County Onshore wind |
270 MW | Withdrawn / abandoned |
| County Line Solar Solar · S Power |
250 MW | Withdrawn / abandoned |
| Buenos Aires 2 W Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| La Joya II Wind Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| La Joya I Wind Onshore wind · Terra-Gen |
237 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-026, Lamb County Onshore wind |
235 MW | Withdrawn / abandoned |
| Oxbow Solar Solar · ENGIE Long Draw Solar 2 LLC |
225 MW | Withdrawn / abandoned |
| Buenos Aires 1 Wind Onshore wind · Terra-Gen |
223 MW | Withdrawn / abandoned |
| Trevino Solar Solar · S Power |
216 MW | Withdrawn / abandoned |
| Shamrock Wind Onshore wind · Eon |
202 MW | Withdrawn / abandoned |
| Shamrock Wind II Onshore wind · Eon |
202 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-012, Castro County Onshore wind |
202 MW | Withdrawn / abandoned |
| Red Mud Creek Onshore wind · RWE Renewables Development, LLC |
201 MW | Withdrawn / abandoned |
| Solar project GEN-2017-065, Wilbarger County Solar |
200 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-039, Bailey County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-044, Ochiltree County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-045, Ochiltree County Onshore wind |
200 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2017-046, Ochiltree County Onshore wind |
200 MW | Withdrawn / abandoned |
| Solar project J867, Polk County Solar |
200 MW | Withdrawn / abandoned |
| March Road Solar Solar · Eon |
200 MW | Withdrawn / abandoned |
| Goodranch Solar Solar · EDF Renewable Energy |
200 MW | Withdrawn / abandoned |
| Solar project GEN-2017-088, Bowie County Solar |
200 MW | Withdrawn / abandoned |
| Flatland Solar Solar · Sunfinity Renewables |
182 MW | Withdrawn / abandoned |
| Bacon Switch Solar Solar · SunChase Power |
180 MW | Withdrawn / abandoned |
| Buffalo Gap 4 Onshore wind · AES |
175 MW | Withdrawn / abandoned |
| N200S PV Project Solar |
170 MW | Withdrawn / abandoned |
| Blackwater Draw Solar Solar · Core Solar |
152 MW | Withdrawn / abandoned |
| Solar project J911, Montgomery County Solar |
150 MW | Withdrawn / abandoned |
| Tom Green Solar Solar · EDP Renewables |
150 MW | Withdrawn / abandoned |
| Stillwater Solar Solar · Cypress Creek Renewables |
144 MW | Withdrawn / abandoned |
| Solar project GEN-2017-058, Deaf Smith County Solar |
135 MW | Withdrawn / abandoned |
| Old Jackson Solar Solar · OLD JACKSON SOLAR LLC |
129 MW | Withdrawn / abandoned |
| Murphy Lake Solar Solar · S Power |
120 MW | Withdrawn / abandoned |
| Red Mud Creek II Onshore wind · Eon |
102 MW | Withdrawn / abandoned |
| Solar project J418, Polk County Solar |
100 MW | Withdrawn / abandoned |
| Solar project J502, Orange County Solar |
100 MW | Withdrawn / abandoned |
| Solar project J932, Liberty County Solar |
100 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)41 · 7,054 MW
- SPP (Southwest Power Pool)24 · 5,371 MW
- MISO (Midcontinent)8 · 878 MW
- West (non-ISO utilities)1 · 170 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)