United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· MISO

Solar project J418, Polk County

Solar project J418, Polk County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Polk County, Texas, connecting to Entergy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J418
Grid region
MISO (Midcontinent)
Utility / transmission owner
Entergy
Connection point (POI)
Rich - Livingston 138kV Line
Location
Polk County, Texas
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
November 2016
Withdrawn
January 2019

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem