United States › Grid › Interconnection queues › Texas
SOLAR · MISOSolar project J1030, Polk County
Solar project J1030, Polk County is a 150 MW solar request built and operating in the MISO interconnection queue, in Polk County, Texas, connecting to ENTERGY TEXAS, INC..
Request details
- Queue ID
- J1030
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- Poco - Menard 138kV Line Tao
- Location
- Polk County, Texas
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA; Post GIA Status: In Service
- Queue status
- Operational
- Entered queue
- 12 March 2018
- Agreement signed
- 22 October 2020
- Proposed online date
- January 2023
- Came online
- January 2023
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Other requests in Polk County
- Solar project J1442, Polk CountySolar · 165 MW · under construction
- Solar + storage project J3985, Polk CountySolar + storage · 240 MW · in study
- Solar project J2754, Polk CountySolar · 170 MW · in study
- Solar project J867, Polk CountySolar · 200 MW · withdrawn
- Solar project J418, Polk CountySolar · 100 MW · withdrawn
- Solar + storage project J2242, Polk CountySolar + storage · 100 MW · withdrawn
- Solar project J1278, Polk CountySolar · 100 MW · withdrawn
- Solar project J1962, Polk CountySolar · 75.0 MW · withdrawn
- Battery storage project J1963, Polk CountyBattery storage · 25.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem