SOLAR + STORAGE Β· MISOSolar + storage project J2242, Polk County
Solar + storage project J2242, Polk County is a 100 MW solar + storage request withdrawn in the MISO interconnection queue, in Polk County, Texas, connecting to ENTERGY TEXAS, INC..
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2242
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- SHECO
- Location
- Polk County, Texas
- Technology
- Solar: 100 MW Β· Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 23 August 2021
- Proposed online date
- October 2024
- Withdrawn
- March 2025
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Other requests in Polk County
- Solar project J1442, Polk CountySolar Β· 165 MW Β· under construction
- Solar + storage project J3985, Polk CountySolar + storage Β· 240 MW Β· in study
- Solar project J2754, Polk CountySolar Β· 170 MW Β· in study
- Solar project J1030, Polk CountySolar Β· 150 MW Β· built
- Solar project J867, Polk CountySolar Β· 200 MW Β· withdrawn
- Solar project J418, Polk CountySolar Β· 100 MW Β· withdrawn
- Solar project J1278, Polk CountySolar Β· 100 MW Β· withdrawn
- Solar project J1962, Polk CountySolar Β· 75.0 MW Β· withdrawn
- Battery storage project J1963, Polk CountyBattery storage Β· 25.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem