BATTERY STORAGE Β· MISO

Battery storage project J1963, Polk County

Battery storage project J1963, Polk County is a 25.0 MW battery storage request withdrawn in the MISO interconnection queue, in Polk County, Texas, connecting to ENTERGY TEXAS, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2021 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1963
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY TEXAS, INC.
Connection point (POI)
Livingston - Rich 138kV
Location
Polk County, Texas
Technology
Battery: 25.0 MW
Total requested
25.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
29 November 2021
Proposed online date
October 2025
Withdrawn
October 2023

Location

Marker shows the centre of Polk County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Polk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem