United States › Grid › Interconnection queues › Texas
SOLAR · MISOSolar project J2754, Polk County
Solar project J2754, Polk County is a 170 MW solar request in interconnection study in the MISO interconnection queue, in Polk County, Texas, connecting to ENTERGY TEXAS, INC..
Queue statusIn planning
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jan 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2754
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- 138kV Bragg - SHECO Menard Line
- Location
- Polk County, Texas
- Technology
- Solar: 170 MW
- Total requested
- 170 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- January 2026
Location
Marker shows the centre of Polk County; the queue data does not give exact sites.
Other requests in Polk County
- Solar project J1442, Polk CountySolar · 165 MW · under construction
- Solar + storage project J3985, Polk CountySolar + storage · 240 MW · in study
- Solar project J1030, Polk CountySolar · 150 MW · built
- Solar project J867, Polk CountySolar · 200 MW · withdrawn
- Solar project J418, Polk CountySolar · 100 MW · withdrawn
- Solar + storage project J2242, Polk CountySolar + storage · 100 MW · withdrawn
- Solar project J1278, Polk CountySolar · 100 MW · withdrawn
- Solar project J1962, Polk CountySolar · 75.0 MW · withdrawn
- Battery storage project J1963, Polk CountyBattery storage · 25.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem