United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· SPPSolar project GEN-2017-088, Bowie County
Solar project GEN-2017-088, Bowie County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Bowie County, Texas, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-088
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Valiant-Lydia 345kV
- Location
- Bowie County, Texas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 26 May 2017
- Proposed online date
- February 2020
- Withdrawn
- January 2019
Location
Marker shows the centre of Bowie County; the queue data does not give exact sites.
Other requests in Bowie County
- Solar project GEN-2020-054, Bowie CountySolar Β· 298 MW Β· agreement signed
- Solar project GEN-2018-003, Bowie CountySolar Β· 150 MW Β· agreement signed
- Solar project GEN-2024-025, Bowie CountySolar Β· 300 MW Β· in study
- Solar project GEN-2024-241, Bowie CountySolar Β· 100 MW Β· in study
- Solar project GEN-2023-135, Bowie CountySolar Β· 52.0 MW Β· in study
- Solar + storage project GEN-2023-212, Bowie CountySolar + storage Β· 400 MW Β· withdrawn
- Solar + storage project GEN-2023-080, Bowie CountySolar + storage Β· 200 MW Β· withdrawn
- Battery storage project GEN-2023-137, Bowie CountyBattery storage Β· 150 MW Β· withdrawn
- Solar project GEN-2018-088, Bowie CountySolar Β· 130 MW Β· withdrawn
- Battery storage project GEN-2018-087, Bowie CountyBattery storage Β· 75.0 MW Β· withdrawn
- Battery storage project GEN-2020-055, Bowie CountyBattery storage Β· 71.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem