BATTERY STORAGE Β· SPP

Battery storage project GEN-2018-087, Bowie County

Battery storage project GEN-2018-087, Bowie County is a 75.0 MW battery storage request withdrawn in the SPP interconnection queue, in Bowie County, Texas, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-087
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Lydia 345kV substation
Location
Bowie County, Texas
Technology
Battery: 75.0 MW
Total requested
75.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
December 2027
Withdrawn
September 2023

Location

Marker shows the centre of Bowie County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bowie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem