πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2020-055, Bowie County

Battery storage project GEN-2020-055, Bowie County is a 71.0 MW battery storage request withdrawn in the SPP interconnection queue, in Bowie County, Texas, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-055
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Lydia 345 kV Station
Location
Bowie County, Texas
Technology
Battery: 71.0 MW
Total requested
71.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
27 April 2020
Proposed online date
December 2025
Came online
December 2025
Withdrawn
April 2023

Location

Marker shows the centre of Bowie County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bowie County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem