SOLAR · SPPSolar project GEN-2024-025, Bowie County
Solar project GEN-2024-025, Bowie County is a 300 MW solar request in interconnection study in the SPP interconnection queue, in Bowie County, Texas, connecting to AEP.
Queue statusIn planning
- PlanningQueued Oct 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2024-025
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Lydia 345 kV Substation
- Location
- Bowie County, Texas
- Technology
- Solar: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- DISIS STAGE
- Queue status
- Active
- Entered queue
- 30 October 2024
- Proposed online date
- December 2030
Location
Marker shows the centre of Bowie County; the queue data does not give exact sites.
Other requests in Bowie County
- Solar project GEN-2020-054, Bowie CountySolar · 298 MW · agreement signed
- Solar project GEN-2018-003, Bowie CountySolar · 150 MW · agreement signed
- Solar project GEN-2024-241, Bowie CountySolar · 100 MW · in study
- Solar project GEN-2023-135, Bowie CountySolar · 52.0 MW · in study
- Solar + storage project GEN-2023-212, Bowie CountySolar + storage · 400 MW · withdrawn
- Solar + storage project GEN-2023-080, Bowie CountySolar + storage · 200 MW · withdrawn
- Solar project GEN-2017-088, Bowie CountySolar · 200 MW · withdrawn
- Battery storage project GEN-2023-137, Bowie CountyBattery storage · 150 MW · withdrawn
- Solar project GEN-2018-088, Bowie CountySolar · 130 MW · withdrawn
- Battery storage project GEN-2018-087, Bowie CountyBattery storage · 75.0 MW · withdrawn
- Battery storage project GEN-2020-055, Bowie CountyBattery storage · 71.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem