United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2017-039, Bailey County
Onshore wind project GEN-2017-039, Bailey County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Bailey County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2017 (completed)
- Withdrawn / abandonedApr 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingSep 2021 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-039
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Needmore 230 kV sub
- Location
- Bailey County, Texas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 May 2017
- Proposed online date
- September 2021
- Came online
- September 2021
- Withdrawn
- April 2021
Location
Marker shows the centre of Bailey County; the queue data does not give exact sites.
Other requests in Bailey County
- Onshore wind project GEN-2024-109, Bailey CountyOnshore wind Β· 401 MW Β· in study
- Onshore wind project GEN-2013-027, Bailey CountyOnshore wind Β· 148 MW Β· built
- Solar project GEN-2023-240, Bailey CountySolar Β· 550 MW Β· withdrawn
- Solar project GEN-2023-158, Bailey CountySolar Β· 335 MW Β· withdrawn
- Solar project GEN-2017-190, Bailey CountySolar Β· 300 MW Β· withdrawn
- Solar project GEN-2023-195, Bailey CountySolar Β· 250 MW Β· withdrawn
- Battery storage project GEN-2023-159, Bailey CountyBattery storage Β· 170 MW Β· withdrawn
- Onshore wind project GEN-2005-010, Bailey CountyOnshore wind Β· 160 MW Β· withdrawn
- Battery storage project GEN-2023-196, Bailey CountyBattery storage Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2007-034, Bailey CountyOnshore wind Β· 150 MW Β· withdrawn
- Solar project GEN-2016-078, Bailey CountySolar Β· 108 MW Β· withdrawn
- Solar project GEN-2016-089, Bailey CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem