Battery storage project GEN-2023-196, Bailey County

Battery storage project GEN-2023-196, Bailey County is a 150 MW battery storage request withdrawn in the SPP interconnection queue, in Bailey County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2023-196
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Roosevelt - Tolk 230 kV line tap
Location
Bailey County, Texas
Technology
Battery: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
2 October 2023
Proposed online date
June 2028
Withdrawn
March 2024

Location

Marker shows the centre of Bailey County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Bailey County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem