Withdrawn queue requests in ERCOT (Texas) — page 20

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,158262.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,158 requests · page 20 of 24
ProjectCapacityStatusLocationRegionQueuedOnline
Atria Solar MW addition
Solar · Atria Energy Project, LLC
61.4 MWWithdrawn / abandoned Liberty, TXERCOT target 2023
Quantum Increase
Solar · IP Quantum
61.2 MWWithdrawn / abandoned Haskell, TXERCOT May 2019target 2021
Radian Increase
Solar · IP Radian, LLC
61.2 MWWithdrawn / abandoned Brown, TXERCOT May 2019target 2021
Tres Margaritas Solar
Solar · Gransolar Texas Six, LLC
61.0 MWWithdrawn / abandoned Dimmit, TXERCOT Jul 2021target 2026
Cedar Bayou
Gas · Cedar Bayou Cogeneration Company
61.0 MWWithdrawn / abandoned ERCOT Aug 2006target 2050
Rosie Solar
Solar · Industrial Delta Project LLC
61.0 MWWithdrawn / abandoned Winkler, TXERCOT Nov 2022target 2026
Bluebonnet Solar
Solar · One Energy Renewables
60.7 MWWithdrawn / abandoned Brewster, TXERCOT Jul 2016target 2022
Wild Horse Wind Farm 1
Onshore wind · Wild Horse Wind Farm I, LLC
60.0 MWWithdrawn / abandoned ERCOT Jul 2002target 2050
Spring Creek Wind
Onshore wind · DKRW Wind, LLC
60.0 MWWithdrawn / abandoned ERCOT Jan 2009target 2050
Wolf Ridge Wind Farm Expansion
Onshore wind · FPL Energy, LLC
60.0 MWWithdrawn / abandoned ERCOT May 2007target 2050
Jackson Mountain Wind Ranch 2
Onshore wind · Gamesa Energy USA
60.0 MWWithdrawn / abandoned ERCOT May 2007target 2050
Obsidian Solar
Solar · Innovative Solar 144
60.0 MWWithdrawn / abandoned Cottle, TXERCOT Jul 2017target 2024
Lund Storage
Other · RRE POWER STORAGE 1 LLC
60.0 MWWithdrawn / abandoned Travis, TXERCOT Apr 2020target 2023
Llano Estacado BESS
Other · VESI 40 LLC
60.0 MWWithdrawn / abandoned Howard, TXERCOT Mar 2021target 2024
Gage Solar
Solar · SunPower
60.0 MWWithdrawn / abandoned ERCOT Sep 2013target 2016
NW Andrews Solar
Solar · One Energy Renewables
60.0 MWWithdrawn / abandoned ERCOT Feb 2015target 2019
RRE Austin Solar
Solar · RRE Austin Solar, LLC
60.0 MWWithdrawn / abandoned ERCOT Mar 2010target 2013
Howle Solar
Solar · Howle Solar LLC
60.0 MWWithdrawn / abandoned Ellis, TXERCOT May 2018target 2024
PetroLogistics PDH
Gas · PetroLogistics PDH LLC
60.0 MWWithdrawn / abandoned Brazoria, TXERCOT Aug 2019target 2022
Big Springs Solar
Solar · RRE Austin Solar, LLC
60.0 MWWithdrawn / abandoned ERCOT Sep 2010target 2050
Westoria Storage
Other · Brazoria West Solar Project, LLC
58.0 MWWithdrawn / abandoned Brazoria, TXERCOT Jun 2018target 2021
Patriot Wind II
Onshore wind · NRG
57.6 MWWithdrawn / abandoned ERCOT Sep 2017target 2019
Buckeye Corpus Fuels Solar
Solar · BAES INFRASTRUCTURE CORPUS CHRISTI SOLAR LLC
57.6 MWWithdrawn / abandoned Nueces, TXERCOT Aug 2020target 2025
West Texas Angelos
Solar · Navasota Energy Management, LLC
57.0 MWWithdrawn / abandoned ERCOT Aug 2009target 2014
Parker Ranch Solar 2
Solar · SunPower
56.0 MWWithdrawn / abandoned ERCOT Dec 2014target 2018
Parker Ranch Solar 3
Solar · SunPower
56.0 MWWithdrawn / abandoned ERCOT Jan 2015target 2018
Greasewood I-B
Solar · Concho Bluff, LLC
55.0 MWWithdrawn / abandoned Pecos, TXERCOT Feb 2019target 2020
Oro Solar
Solar · Recurrent Energy
55.0 MWWithdrawn / abandoned ERCOT Nov 2013target 2017
La Feria Irrigation District 1 Solar
Solar · La Patrona Floating Solar LLC
54.4 MWWithdrawn / abandoned Cameron, TXERCOT May 2023target 2027
Harlingen Irrigation District 1 Solar
Solar · Six Shooter Floating Solar LLC
54.3 MWWithdrawn / abandoned Cameron, TXERCOT May 2023target 2027
Salt Fork Wind Expansion
Onshore wind · Southern Power Company
54.0 MWWithdrawn / abandoned ERCOT Oct 2015target 2018
Painted Horse Storage
Battery storage · RWE Solar Development, LLC
53.2 MWWithdrawn / abandoned ERCOT Jul 2020target 2025
Point Rider BESS
Other · Point Rider Solar Project, LLC
53.0 MWWithdrawn / abandoned Navarro, TXERCOT target 2023
Jefferson Enterprise Energy
Other · ONCOR
53.0 MWWithdrawn / abandoned Angelina, TXERCOT Sep 2021target 2025
Freer Wind
Onshore wind · EDF Renewables
53.0 MWWithdrawn / abandoned ERCOT Aug 2015target 2019
Itsee Solar
Solar · Gransolar Texas Seventeen, LLC
52.9 MWWithdrawn / abandoned Navarro, TXERCOT Oct 2021target 2027
Endurance Park Storage 2
Other · KCE TX 22, LLC
52.3 MWWithdrawn / abandoned Scurry, TXERCOT Apr 2020target 2022
Brushy Creek Solar B
Solar · Brushy Creek Solar LLC
52.1 MWWithdrawn / abandoned ERCOT target 2021
Quail Run Storage System
Battery storage · Quail Run Energy Partners, LP
51.6 MWWithdrawn / abandoned Ector, TXERCOT Feb 2021target 2026
Kobernat Storage
Battery storage · BT Kobernat Solar, LLC
51.5 MWWithdrawn / abandoned Starr, TXERCOT Feb 2024target 2026
Belding 2 Batt
Other · Triple Butte II LLC
51.5 MWWithdrawn / abandoned Pecos, TXERCOT Mar 2020target 2024
Columbus Storage
Battery storage · EDP Renewables North America LLC
51.3 MWWithdrawn / abandoned ERCOT Aug 2021target 2026
Southern Star Storage SLF
Battery storage · Southern Star Solar Project, LLC
51.1 MWWithdrawn / abandoned ERCOT Mar 2025target 2029
M&G Resins Corpus Christi
Gas · M&G Resins USA, LLC
51.0 MWWithdrawn / abandoned ERCOT Jan 2014target 2015
Buzios Solar - ADD ADDITIONAL MW CAPACITY
Solar · Stafford Solar
51.0 MWWithdrawn / abandoned Motley, TXERCOT target 2025
Sheffield Solar (Solar Star 1)
Solar · Solar Star Texas I (SunPower Corp)
51.0 MWWithdrawn / abandoned ERCOT Jul 2013target 2015
Brotman Energy Storage
Other · WattBridge Energy, LLC
50.8 MWWithdrawn / abandoned Brazoria, TXERCOT Dec 2020target 2023
Red-tailed Hawk Solar increase
Solar · AP Solar 6, LLC
50.7 MWWithdrawn / abandoned ERCOT Sep 2019target 2021
Montezuma Storage
Battery storage · Montezuma Storage LLC
50.6 MWWithdrawn / abandoned ERCOT Jan 2019target 2028
Pisgah Ridge Storage
Other · Duke Energy Renewables Solar, LLC
50.6 MWWithdrawn / abandoned Navarro, TXERCOT Dec 2019target 2022
Page 20 of 24

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)