United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 20
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Atria Solar MW addition Solar · Atria Energy Project, LLC |
61.4 MW | Withdrawn / abandoned |
| Quantum Increase Solar · IP Quantum |
61.2 MW | Withdrawn / abandoned |
| Radian Increase Solar · IP Radian, LLC |
61.2 MW | Withdrawn / abandoned |
| Tres Margaritas Solar Solar · Gransolar Texas Six, LLC |
61.0 MW | Withdrawn / abandoned |
| Cedar Bayou Gas · Cedar Bayou Cogeneration Company |
61.0 MW | Withdrawn / abandoned |
| Rosie Solar Solar · Industrial Delta Project LLC |
61.0 MW | Withdrawn / abandoned |
| Bluebonnet Solar Solar · One Energy Renewables |
60.7 MW | Withdrawn / abandoned |
| Wild Horse Wind Farm 1 Onshore wind · Wild Horse Wind Farm I, LLC |
60.0 MW | Withdrawn / abandoned |
| Spring Creek Wind Onshore wind · DKRW Wind, LLC |
60.0 MW | Withdrawn / abandoned |
| Wolf Ridge Wind Farm Expansion Onshore wind · FPL Energy, LLC |
60.0 MW | Withdrawn / abandoned |
| Jackson Mountain Wind Ranch 2 Onshore wind · Gamesa Energy USA |
60.0 MW | Withdrawn / abandoned |
| Obsidian Solar Solar · Innovative Solar 144 |
60.0 MW | Withdrawn / abandoned |
| Lund Storage Other · RRE POWER STORAGE 1 LLC |
60.0 MW | Withdrawn / abandoned |
| Llano Estacado BESS Other · VESI 40 LLC |
60.0 MW | Withdrawn / abandoned |
| Gage Solar Solar · SunPower |
60.0 MW | Withdrawn / abandoned |
| NW Andrews Solar Solar · One Energy Renewables |
60.0 MW | Withdrawn / abandoned |
| RRE Austin Solar Solar · RRE Austin Solar, LLC |
60.0 MW | Withdrawn / abandoned |
| Howle Solar Solar · Howle Solar LLC |
60.0 MW | Withdrawn / abandoned |
| PetroLogistics PDH Gas · PetroLogistics PDH LLC |
60.0 MW | Withdrawn / abandoned |
| Big Springs Solar Solar · RRE Austin Solar, LLC |
60.0 MW | Withdrawn / abandoned |
| Westoria Storage Other · Brazoria West Solar Project, LLC |
58.0 MW | Withdrawn / abandoned |
| Patriot Wind II Onshore wind · NRG |
57.6 MW | Withdrawn / abandoned |
| Buckeye Corpus Fuels Solar Solar · BAES INFRASTRUCTURE CORPUS CHRISTI SOLAR LLC |
57.6 MW | Withdrawn / abandoned |
| West Texas Angelos Solar · Navasota Energy Management, LLC |
57.0 MW | Withdrawn / abandoned |
| Parker Ranch Solar 2 Solar · SunPower |
56.0 MW | Withdrawn / abandoned |
| Parker Ranch Solar 3 Solar · SunPower |
56.0 MW | Withdrawn / abandoned |
| Greasewood I-B Solar · Concho Bluff, LLC |
55.0 MW | Withdrawn / abandoned |
| Oro Solar Solar · Recurrent Energy |
55.0 MW | Withdrawn / abandoned |
| La Feria Irrigation District 1 Solar Solar · La Patrona Floating Solar LLC |
54.4 MW | Withdrawn / abandoned |
| Harlingen Irrigation District 1 Solar Solar · Six Shooter Floating Solar LLC |
54.3 MW | Withdrawn / abandoned |
| Salt Fork Wind Expansion Onshore wind · Southern Power Company |
54.0 MW | Withdrawn / abandoned |
| Painted Horse Storage Battery storage · RWE Solar Development, LLC |
53.2 MW | Withdrawn / abandoned |
| Point Rider BESS Other · Point Rider Solar Project, LLC |
53.0 MW | Withdrawn / abandoned |
| Jefferson Enterprise Energy Other · ONCOR |
53.0 MW | Withdrawn / abandoned |
| Freer Wind Onshore wind · EDF Renewables |
53.0 MW | Withdrawn / abandoned |
| Itsee Solar Solar · Gransolar Texas Seventeen, LLC |
52.9 MW | Withdrawn / abandoned |
| Endurance Park Storage 2 Other · KCE TX 22, LLC |
52.3 MW | Withdrawn / abandoned |
| Brushy Creek Solar B Solar · Brushy Creek Solar LLC |
52.1 MW | Withdrawn / abandoned |
| Quail Run Storage System Battery storage · Quail Run Energy Partners, LP |
51.6 MW | Withdrawn / abandoned |
| Kobernat Storage Battery storage · BT Kobernat Solar, LLC |
51.5 MW | Withdrawn / abandoned |
| Belding 2 Batt Other · Triple Butte II LLC |
51.5 MW | Withdrawn / abandoned |
| Columbus Storage Battery storage · EDP Renewables North America LLC |
51.3 MW | Withdrawn / abandoned |
| Southern Star Storage SLF Battery storage · Southern Star Solar Project, LLC |
51.1 MW | Withdrawn / abandoned |
| M&G Resins Corpus Christi Gas · M&G Resins USA, LLC |
51.0 MW | Withdrawn / abandoned |
| Buzios Solar - ADD ADDITIONAL MW CAPACITY Solar · Stafford Solar |
51.0 MW | Withdrawn / abandoned |
| Sheffield Solar (Solar Star 1) Solar · Solar Star Texas I (SunPower Corp) |
51.0 MW | Withdrawn / abandoned |
| Brotman Energy Storage Other · WattBridge Energy, LLC |
50.8 MW | Withdrawn / abandoned |
| Red-tailed Hawk Solar increase Solar · AP Solar 6, LLC |
50.7 MW | Withdrawn / abandoned |
| Montezuma Storage Battery storage · Montezuma Storage LLC |
50.6 MW | Withdrawn / abandoned |
| Pisgah Ridge Storage Other · Duke Energy Renewables Solar, LLC |
50.6 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)