United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Atria Solar MW addition

Atria Solar MW addition is a 61.4 MW solar request withdrawn in the ERCOT interconnection queue, in Liberty County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0226
Grid region
ERCOT (Texas)
Developer
Atria Energy Project, LLC
Connection point (POI)
40770 Hacher 138kV
Location
Liberty County, Texas
Technology
Solar: 61.4 MW
Total requested
61.4 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
April 2023
Withdrawn
March 2021

Location

Marker shows the centre of Liberty County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Liberty County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem