United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTRosie Solar
Rosie Solar is a 61.0 MW solar request withdrawn in the ERCOT interconnection queue, in Winkler County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2022 (completed)
- Withdrawn / abandonedMar 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0240
- Grid region
- ERCOT (Texas)
- Developer
- Industrial Delta Project LLC
- Connection point (POI)
- TNAAPIPLNC1 (38137)
- Location
- Winkler County, Texas
- Technology
- Solar: 61.0 MW
- Total requested
- 61.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 6 November 2022
- Proposed online date
- May 2026
- Withdrawn
- March 2024
Location
Marker shows the centre of Winkler County; the queue data does not give exact sites.
Other requests in Winkler County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem