Rosie Solar

Rosie Solar is a 61.0 MW solar request withdrawn in the ERCOT interconnection queue, in Winkler County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2022 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0240
Grid region
ERCOT (Texas)
Developer
Industrial Delta Project LLC
Connection point (POI)
TNAAPIPLNC1 (38137)
Location
Winkler County, Texas
Technology
Solar: 61.0 MW
Total requested
61.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 November 2022
Proposed online date
May 2026
Withdrawn
March 2024

Location

Marker shows the centre of Winkler County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Winkler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem