United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTSIXTY SIX Solar
SIXTY SIX Solar is a 3.8 MW solar request withdrawn in the ERCOT interconnection queue, in Winkler County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2019 (completed)
- Withdrawn / abandonedJul 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0274
- Grid region
- ERCOT (Texas)
- Developer
- MERIT SI DEVELOPMENT, LLC
- Connection point (POI)
- 38212 TNMONMNTDC0 138kv TNMPβΓΓ΄s Monument Draw switching station
- Location
- Winkler County, Texas
- Technology
- Solar: 3.8 MW
- Total requested
- 3.8 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 19 June 2019
- Proposed online date
- November 2022
- Withdrawn
- July 2022
Location
Marker shows the centre of Winkler County; the queue data does not give exact sites.
Other requests in Winkler County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem