SIXTY SIX Solar

SIXTY SIX Solar is a 3.8 MW solar request withdrawn in the ERCOT interconnection queue, in Winkler County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2019 (completed)
  2. Withdrawn / abandonedJul 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0274
Grid region
ERCOT (Texas)
Developer
MERIT SI DEVELOPMENT, LLC
Connection point (POI)
38212 TNMONMNTDC0 138kv TNMPβ€šΓ„Γ΄s Monument Draw switching station
Location
Winkler County, Texas
Technology
Solar: 3.8 MW
Total requested
3.8 MW
Study phase
FIS Complete
Queue status
Withdrawn
Entered queue
19 June 2019
Proposed online date
November 2022
Withdrawn
July 2022

Location

Marker shows the centre of Winkler County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Winkler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem