United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTWinkler Solar
Winkler Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue, in Winkler County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2016 (completed)
- Withdrawn / abandonedDec 2018 (project stopped here)
- ConsentedJan 2018 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 18INR0022
- Grid region
- ERCOT (Texas)
- Developer
- RES Americas
- Connection point (POI)
- tap 138kV 1009 Yucca - 1146 Notrees
- Location
- Winkler County, Texas
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 2 February 2016
- Agreement signed
- 23 January 2018
- Proposed online date
- December 2019
- Withdrawn
- December 2018
Location
Marker shows the centre of Winkler County; the queue data does not give exact sites.
Other requests in Winkler County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem