United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTPhoebe Solar
Phoebe Solar is a 250 MW solar request built and operating in the ERCOT interconnection queue, in Winkler County, Texas.
Request details
- Queue ID
- 19INR0029
- Grid region
- ERCOT (Texas)
- Developer
- Longroad Energy
- Connection point (POI)
- 11260 Dune Switch
- Location
- Winkler County, Texas
- Technology
- Solar: 250 MW
- Total requested
- 250 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 25 January 2017
- Agreement signed
- 5 March 2018
- Proposed online date
- October 2019
- Came online
- November 2019
Location
Marker shows the centre of Winkler County; the queue data does not give exact sites.
Other requests in Winkler County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem