United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTSouthern Star Storage SLF
Southern Star Storage SLF is a 51.1 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 29INR0076
- Grid region
- ERCOT (Texas)
- Developer
- Southern Star Solar Project, LLC
- Connection point (POI)
- To Tap 138 kV Bigfoot (Bus# 8221) to Pleasanton (Bus# 8203)
- Technology
- Battery: 51.1 MW
- Total requested
- 51.1 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 24 March 2025
- Proposed online date
- May 2029
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem