United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Red-tailed Hawk Solar increase

Red-tailed Hawk Solar increase is a 50.7 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandonedSep 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0433
Grid region
ERCOT (Texas)
Developer
AP Solar 6, LLC
Connection point (POI)
tap 345kV 44200 Hillje - 44000 WA Parish
Technology
Solar: 50.7 MW
Total requested
50.7 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Entered queue
19 September 2019
Proposed online date
December 2021
Withdrawn
September 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem