SOLAR Β· ERCOTRed-tailed Hawk Solar increase
Red-tailed Hawk Solar increase is a 50.7 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2019 (completed)
- Withdrawn / abandonedSep 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0433
- Grid region
- ERCOT (Texas)
- Developer
- AP Solar 6, LLC
- Connection point (POI)
- tap 345kV 44200 Hillje - 44000 WA Parish
- Technology
- Solar: 50.7 MW
- Total requested
- 50.7 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Entered queue
- 19 September 2019
- Proposed online date
- December 2021
- Withdrawn
- September 2019
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem