πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Quantum Increase

Quantum Increase is a 61.2 MW solar request withdrawn in the ERCOT interconnection queue, in Haskell County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJun 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0310
Grid region
ERCOT (Texas)
Developer
IP Quantum
Connection point (POI)
60515 Clear Crossing 345kV
Location
Haskell County, Texas
Technology
Solar: 61.2 MW
Total requested
61.2 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 May 2019
Proposed online date
December 2021
Withdrawn
June 2019

Location

Marker shows the centre of Haskell County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Haskell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem