United States βΊ Grid βΊ Interconnection queues
BATTERY STORAGE Β· ERCOTMontezuma Storage
Montezuma Storage is a 50.6 MW battery storage request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0244
- Grid region
- ERCOT (Texas)
- Developer
- Montezuma Storage LLC
- Connection point (POI)
- 7258 Glidden 138kV
- Technology
- Battery: 50.6 MW
- Total requested
- 50.6 MW
- Study phase
- FIS Complete
- Queue status
- Withdrawn
- Entered queue
- 15 January 2019
- Proposed online date
- February 2028
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem