United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Greasewood I-B

Greasewood I-B is a 55.0 MW solar request withdrawn in the ERCOT interconnection queue, in Pecos County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2019 (completed)
  2. Withdrawn / abandonedOct 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0254
Grid region
ERCOT (Texas)
Developer
Concho Bluff, LLC
Connection point (POI)
tap 345kV 76002 Bakersfield - 76000 NMcCamey
Location
Pecos County, Texas
Technology
Solar: 55.0 MW
Total requested
55.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 February 2019
Proposed online date
September 2020
Withdrawn
October 2019

Location

Marker shows the centre of Pecos County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Pecos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem