United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Columbus Storage

Columbus Storage is a 51.3 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0322
Grid region
ERCOT (Texas)
Developer
EDP Renewables North America LLC
Connection point (POI)
78103 Nada Substation 138kV
Technology
Battery: 51.3 MW
Total requested
51.3 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
12 August 2021
Proposed online date
March 2026

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem