United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Bluebonnet Solar

Bluebonnet Solar is a 60.7 MW solar request withdrawn in the ERCOT interconnection queue, in Brewster County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2016 (completed)
  2. Withdrawn / abandonedNov 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19INR0006
Grid region
ERCOT (Texas)
Developer
One Energy Renewables
Connection point (POI)
tap 138kV 6680 Alamito - 60444 Hayter
Location
Brewster County, Texas
Technology
Solar: 60.7 MW
Total requested
60.7 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
17 July 2016
Proposed online date
December 2022
Withdrawn
November 2020

Location

Marker shows the centre of Brewster County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brewster County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem