Bluebonnet Solar is a 60.7 MW solar request withdrawn in the ERCOT interconnection queue, in Brewster County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2016 (completed)
- Withdrawn / abandonedNov 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 19INR0006
- Grid region
- ERCOT (Texas)
- Developer
- One Energy Renewables
- Connection point (POI)
- tap 138kV 6680 Alamito - 60444 Hayter
- Location
- Brewster County, Texas
- Technology
- Solar: 60.7 MW
- Total requested
- 60.7 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 17 July 2016
- Proposed online date
- December 2022
- Withdrawn
- November 2020
Location
Marker shows the centre of Brewster County; the queue data does not give exact sites.