SOLAR Β· ERCOTHecate Solar
Hecate Solar is a 33.0 MW solar request suspended in the ERCOT interconnection queue, in Brewster County, Texas.
Queue statusPaused / redesign
- PlanningQueued Mar 2015 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2020 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 16INR0099
- Grid region
- ERCOT (Texas)
- Developer
- Hecate Energy
- Connection point (POI)
- tap 69kV 6653 Barilla - 6665 Alpine REA
- Location
- Brewster County, Texas
- Technology
- Solar: 33.0 MW
- Total requested
- 33.0 MW
- Study phase
- FIS
- Queue status
- Suspended
- Entered queue
- 26 March 2015
- Proposed online date
- December 2020
Location
Marker shows the centre of Brewster County; the queue data does not give exact sites.
Other requests in Brewster County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem