United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Hecate Solar

Hecate Solar is a 33.0 MW solar request suspended in the ERCOT interconnection queue, in Brewster County, Texas.

Queue statusPaused / redesign
  1. PlanningQueued Mar 2015 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2020 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
16INR0099
Grid region
ERCOT (Texas)
Developer
Hecate Energy
Connection point (POI)
tap 69kV 6653 Barilla - 6665 Alpine REA
Location
Brewster County, Texas
Technology
Solar: 33.0 MW
Total requested
33.0 MW
Study phase
FIS
Queue status
Suspended
Entered queue
26 March 2015
Proposed online date
December 2020

Location

Marker shows the centre of Brewster County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brewster County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem