SOLAR Β· ERCOTTres Margaritas Solar
Tres Margaritas Solar is a 61.0 MW solar request withdrawn in the ERCOT interconnection queue, in Dimmit County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2021 (completed)
- Withdrawn / abandonedFeb 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0088
- Grid region
- ERCOT (Texas)
- Developer
- Gransolar Texas Six, LLC
- Connection point (POI)
- Tap 138kV 8613 Big Wells βΓΓ¬ 8212 Dilley Switching Station
- Location
- Dimmit County, Texas
- Technology
- Solar: 61.0 MW
- Total requested
- 61.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 12 July 2021
- Proposed online date
- June 2026
- Withdrawn
- February 2025
Location
Marker shows the centre of Dimmit County; the queue data does not give exact sites.
Other requests in Dimmit County
- Carrizo Springs BESSBattery storage Β· 10.0 MW Β· agreement signed
- Onshore wind project GEN-2025-GR6, Dimmit CountyOnshore wind Β· 300 MW Β· in study
- Desert Palm BESSBattery storage Β· 201 MW Β· in study
- Wintergarden BESSBattery storage Β· 201 MW Β· in study
- Saluga Ranch StorageBattery storage Β· 125 MW Β· in study
- Wild Horse Desert SolarSolar + storage Β· 120 MW Β· in study
- Velado Storage SLFSolar + storage Β· 115 MW Β· in study
- Velado Solar SLFSolar + storage Β· 115 MW Β· in study
- Rose Quartz BESSBattery storage Β· 101 MW Β· in study
- Sugarloaf BESSBattery storage Β· 101 MW Β· in study
- Wild Horse Desert StorageSolar + storage Β· 90.3 MW Β· in study
- 7L Solar SLFSolar + storage Β· 71.6 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem