United States βΊ Grid βΊ Interconnection queues
SOLAR Β· ERCOTParker Ranch Solar 2
Parker Ranch Solar 2 is a 56.0 MW solar request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2014 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0080
- Grid region
- ERCOT (Texas)
- Developer
- SunPower
- Connection point (POI)
- Alpine-TNBelding 69kV
- Technology
- Solar: 56.0 MW
- Total requested
- 56.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 30 December 2014
- Proposed online date
- December 2018
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem