SOLAR Β· ERCOTRadian Increase
Radian Increase is a 61.2 MW solar request withdrawn in the ERCOT interconnection queue, in Brown County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0307
- Grid region
- ERCOT (Texas)
- Developer
- IP Radian, LLC
- Connection point (POI)
- 1444 Brown 345kV
- Location
- Brown County, Texas
- Technology
- Solar: 61.2 MW
- Total requested
- 61.2 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 1 May 2019
- Proposed online date
- May 2021
- Withdrawn
- August 2019
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Other requests in Brown County
- Brookesmith StorageBattery storage Β· 351 MW Β· in study
- Mountaineer SolarSolar Β· 332 MW Β· in study
- Soluce Bravo StorageSolar + storage Β· 302 MW Β· in study
- Horseshoe Bend SolarSolar Β· 301 MW Β· in study
- Nouveau BESSBattery storage Β· 256 MW Β· in study
- Blanket Ranch North SolarSolar + storage Β· 189 MW Β· in study
- Wetzel BESSBattery storage Β· 186 MW Β· in study
- Chisme SolarSolar + storage Β· 147 MW Β· in study
- Chisme StorageSolar + storage Β· 146 MW Β· in study
- Coyote Ridge BESSBattery storage Β· 111 MW Β· in study
- Blanket Ranch South SolarSolar + storage Β· 101 MW Β· in study
- Soluce Bravo SolarSolar + storage Β· 80.5 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem