United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Radian Increase

Radian Increase is a 61.2 MW solar request withdrawn in the ERCOT interconnection queue, in Brown County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0307
Grid region
ERCOT (Texas)
Developer
IP Radian, LLC
Connection point (POI)
1444 Brown 345kV
Location
Brown County, Texas
Technology
Solar: 61.2 MW
Total requested
61.2 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
1 May 2019
Proposed online date
May 2021
Withdrawn
August 2019

Location

Marker shows the centre of Brown County; the queue data does not give exact sites.