Pisgah Ridge Storage

Pisgah Ridge Storage is a 50.6 MW other request withdrawn in the ERCOT interconnection queue, in Navarro County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2019 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0263
Grid region
ERCOT (Texas)
Developer
Duke Energy Renewables Solar, LLC
Connection point (POI)
tap 345kV 68091 Navarro - 46020 Limestone
Location
Navarro County, Texas
Technology
Other: 50.6 MW
Total requested
50.6 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
2 December 2019
Proposed online date
December 2022
Withdrawn
July 2020

Location

Marker shows the centre of Navarro County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Navarro County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem