United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

PetroLogistics PDH

PetroLogistics PDH is a 60.0 MW gas request withdrawn in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0224
Grid region
ERCOT (Texas)
Developer
PetroLogistics PDH LLC
Connection point (POI)
42100 Hudson POI 138kV
Location
Brazoria County, Texas
Technology
Gas: 60.0 MW
Total requested
60.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 August 2019
Proposed online date
February 2022
Withdrawn
April 2020

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem